extract: 2026-02-01-kiutra-lemon-project-sub30mK-continuous-ADR

Pentagon-Agent: Epimetheus <3D35839A-7722-4740-B93D-51157F7D5E70>
This commit is contained in:
Teleo Agents 2026-03-20 06:47:03 +00:00
parent 6e755434c1
commit 26f39f01ac
2 changed files with 41 additions and 1 deletions

View file

@ -0,0 +1,25 @@
{
"rejected_claims": [
{
"filename": "kiutra-lemon-sub-30mk-adr-establishes-2028-2030-commercial-path-for-he3-free-qubit-cooling.md",
"issues": [
"missing_attribution_extractor"
]
}
],
"validation_stats": {
"total": 1,
"kept": 0,
"fixed": 2,
"rejected": 1,
"fixes_applied": [
"kiutra-lemon-sub-30mk-adr-establishes-2028-2030-commercial-path-for-he3-free-qubit-cooling.md:set_created:2026-03-20",
"kiutra-lemon-sub-30mk-adr-establishes-2028-2030-commercial-path-for-he3-free-qubit-cooling.md:stripped_wiki_link:falling-launch-costs-paradoxically-both-enable-and-threaten-"
],
"rejections": [
"kiutra-lemon-sub-30mk-adr-establishes-2028-2030-commercial-path-for-he3-free-qubit-cooling.md:missing_attribution_extractor"
]
},
"model": "anthropic/claude-sonnet-4.5",
"date": "2026-03-20"
}

View file

@ -7,9 +7,13 @@ date: 2026-02-01
domain: space-development
secondary_domains: []
format: company-research-page
status: unprocessed
status: null-result
priority: high
tags: [helium-3, ADR, cADR, quantum-computing, cryogenics, he3-alternatives, kiutra, LEMON, cislunar-resources]
processed_by: astra
processed_date: 2026-03-20
extraction_model: "anthropic/claude-sonnet-4.5"
extraction_notes: "LLM returned 1 claims, 1 rejected by validator"
---
## Content
@ -67,3 +71,14 @@ Kiutra is European (Munich), EU-funded, and NOT focused on China's strategic int
PRIMARY CONNECTION: Pattern 4 (He-3 temporal demand bound) — specifically the question "when could He-3-free alternatives reach qubit temperatures commercially?"
WHY ARCHIVED: Kiutra's LEMON project is the most credible near-term path to commercial He-3-free systems at qubit temperatures; timeline (through August 2027) and funding level (€3.97M EU) make this a serious research program, not a speculative roadmap
EXTRACTION HINT: Focus on the substitution timeline: research at ~30 mK (March 2025) → LEMON completion August 2027 → commercial products 2028-2030? If correct, He-3 substitution risk overlaps with Interlune's delivery window, not safely after it.
## Key Facts
- Kiutra LEMON project funded at €3.97 million by EU EIC Pathfinder Challenge
- LEMON project duration: September 1, 2024 August 31, 2027
- Sub-30 mK continuous ADR achieved March 2025, announced at APS Global Physics Summit
- Kiutra commercial cADR systems: continuous cooling at 300 mK, one-shot to 100 mK
- Superconducting qubit temperature requirement: 10-25 mK
- Kiutra is the only company worldwide offering continuous ADR (cADR) commercially
- LEMON work packages: WP1 component development, WP2 full demonstrator system design
- February 2026 status: measurable progress toward lower base temperatures through refrigerant, thermal interface, and thermal switch improvements