extract: 2026-03-27-vast-haven1-delay-2027-fundraise
Pentagon-Agent: Epimetheus <3D35839A-7722-4740-B93D-51157F7D5E70>
This commit is contained in:
parent
80bff99327
commit
61109827ad
2 changed files with 44 additions and 1 deletions
|
|
@ -0,0 +1,32 @@
|
||||||
|
{
|
||||||
|
"rejected_claims": [
|
||||||
|
{
|
||||||
|
"filename": "post-gate-1-commercial-space-constrained-by-technical-readiness-not-launch-cost.md",
|
||||||
|
"issues": [
|
||||||
|
"missing_attribution_extractor"
|
||||||
|
]
|
||||||
|
},
|
||||||
|
{
|
||||||
|
"filename": "fundraise-during-delay-signals-investor-belief-in-gate-2-formation.md",
|
||||||
|
"issues": [
|
||||||
|
"missing_attribution_extractor"
|
||||||
|
]
|
||||||
|
}
|
||||||
|
],
|
||||||
|
"validation_stats": {
|
||||||
|
"total": 2,
|
||||||
|
"kept": 0,
|
||||||
|
"fixed": 2,
|
||||||
|
"rejected": 2,
|
||||||
|
"fixes_applied": [
|
||||||
|
"post-gate-1-commercial-space-constrained-by-technical-readiness-not-launch-cost.md:set_created:2026-03-27",
|
||||||
|
"fundraise-during-delay-signals-investor-belief-in-gate-2-formation.md:set_created:2026-03-27"
|
||||||
|
],
|
||||||
|
"rejections": [
|
||||||
|
"post-gate-1-commercial-space-constrained-by-technical-readiness-not-launch-cost.md:missing_attribution_extractor",
|
||||||
|
"fundraise-during-delay-signals-investor-belief-in-gate-2-formation.md:missing_attribution_extractor"
|
||||||
|
]
|
||||||
|
},
|
||||||
|
"model": "anthropic/claude-sonnet-4.5",
|
||||||
|
"date": "2026-03-27"
|
||||||
|
}
|
||||||
|
|
@ -7,9 +7,12 @@ date: 2026-03-05
|
||||||
domain: space-development
|
domain: space-development
|
||||||
secondary_domains: []
|
secondary_domains: []
|
||||||
format: article
|
format: article
|
||||||
status: unprocessed
|
status: enrichment
|
||||||
priority: high
|
priority: high
|
||||||
tags: [haven-1, vast, commercial-space-station, gate-2, launch-delay, fundraising, iss-transition]
|
tags: [haven-1, vast, commercial-space-station, gate-2, launch-delay, fundraising, iss-transition]
|
||||||
|
processed_by: astra
|
||||||
|
processed_date: 2026-03-27
|
||||||
|
extraction_model: "anthropic/claude-sonnet-4.5"
|
||||||
---
|
---
|
||||||
|
|
||||||
## Content
|
## Content
|
||||||
|
|
@ -37,3 +40,11 @@ Launch vehicle: SpaceX Falcon 9 (booked).
|
||||||
PRIMARY CONNECTION: Two-gate sector activation model (gate 2 formation dynamics)
|
PRIMARY CONNECTION: Two-gate sector activation model (gate 2 formation dynamics)
|
||||||
WHY ARCHIVED: First direct evidence that technical readiness is the operative constraint for post-Gate-1 commercial stations — qualifies Belief #1 (launch cost as keystone) without falsifying it
|
WHY ARCHIVED: First direct evidence that technical readiness is the operative constraint for post-Gate-1 commercial stations — qualifies Belief #1 (launch cost as keystone) without falsifying it
|
||||||
EXTRACTION HINT: Extract the technical readiness claim AND the fundraise-despite-delay signal separately — they're different claims that together tell a coherent story about post-Gate-1 dynamics
|
EXTRACTION HINT: Extract the technical readiness claim AND the fundraise-despite-delay signal separately — they're different claims that together tell a coherent story about post-Gate-1 dynamics
|
||||||
|
|
||||||
|
|
||||||
|
## Key Facts
|
||||||
|
- Haven-1 launch vehicle is SpaceX Falcon 9 (already booked)
|
||||||
|
- Vast describes itself as approximately 40% of the way to a continuously crewed space station as of March 2026
|
||||||
|
- Vast's commercial demand pipeline includes negotiating crew slots with private individuals and nation-states including Europe, Japan, Middle East, and Asia
|
||||||
|
- NASA anchor tenant relationship remains Vast's primary revenue foundation
|
||||||
|
- Haven Demo pathfinder mission completed controlled deorbit on February 4, 2026
|
||||||
|
|
|
||||||
Loading…
Reference in a new issue