extract: 2026-03-27-vast-haven1-delay-2027-fundraise
Pentagon-Agent: Epimetheus <3D35839A-7722-4740-B93D-51157F7D5E70>
This commit is contained in:
parent
80bff99327
commit
61109827ad
2 changed files with 44 additions and 1 deletions
|
|
@ -0,0 +1,32 @@
|
|||
{
|
||||
"rejected_claims": [
|
||||
{
|
||||
"filename": "post-gate-1-commercial-space-constrained-by-technical-readiness-not-launch-cost.md",
|
||||
"issues": [
|
||||
"missing_attribution_extractor"
|
||||
]
|
||||
},
|
||||
{
|
||||
"filename": "fundraise-during-delay-signals-investor-belief-in-gate-2-formation.md",
|
||||
"issues": [
|
||||
"missing_attribution_extractor"
|
||||
]
|
||||
}
|
||||
],
|
||||
"validation_stats": {
|
||||
"total": 2,
|
||||
"kept": 0,
|
||||
"fixed": 2,
|
||||
"rejected": 2,
|
||||
"fixes_applied": [
|
||||
"post-gate-1-commercial-space-constrained-by-technical-readiness-not-launch-cost.md:set_created:2026-03-27",
|
||||
"fundraise-during-delay-signals-investor-belief-in-gate-2-formation.md:set_created:2026-03-27"
|
||||
],
|
||||
"rejections": [
|
||||
"post-gate-1-commercial-space-constrained-by-technical-readiness-not-launch-cost.md:missing_attribution_extractor",
|
||||
"fundraise-during-delay-signals-investor-belief-in-gate-2-formation.md:missing_attribution_extractor"
|
||||
]
|
||||
},
|
||||
"model": "anthropic/claude-sonnet-4.5",
|
||||
"date": "2026-03-27"
|
||||
}
|
||||
|
|
@ -7,9 +7,12 @@ date: 2026-03-05
|
|||
domain: space-development
|
||||
secondary_domains: []
|
||||
format: article
|
||||
status: unprocessed
|
||||
status: enrichment
|
||||
priority: high
|
||||
tags: [haven-1, vast, commercial-space-station, gate-2, launch-delay, fundraising, iss-transition]
|
||||
processed_by: astra
|
||||
processed_date: 2026-03-27
|
||||
extraction_model: "anthropic/claude-sonnet-4.5"
|
||||
---
|
||||
|
||||
## Content
|
||||
|
|
@ -37,3 +40,11 @@ Launch vehicle: SpaceX Falcon 9 (booked).
|
|||
PRIMARY CONNECTION: Two-gate sector activation model (gate 2 formation dynamics)
|
||||
WHY ARCHIVED: First direct evidence that technical readiness is the operative constraint for post-Gate-1 commercial stations — qualifies Belief #1 (launch cost as keystone) without falsifying it
|
||||
EXTRACTION HINT: Extract the technical readiness claim AND the fundraise-despite-delay signal separately — they're different claims that together tell a coherent story about post-Gate-1 dynamics
|
||||
|
||||
|
||||
## Key Facts
|
||||
- Haven-1 launch vehicle is SpaceX Falcon 9 (already booked)
|
||||
- Vast describes itself as approximately 40% of the way to a continuously crewed space station as of March 2026
|
||||
- Vast's commercial demand pipeline includes negotiating crew slots with private individuals and nation-states including Europe, Japan, Middle East, and Asia
|
||||
- NASA anchor tenant relationship remains Vast's primary revenue foundation
|
||||
- Haven Demo pathfinder mission completed controlled deorbit on February 4, 2026
|
||||
|
|
|
|||
Loading…
Reference in a new issue