extract: 2026-03-28-payloadspace-vast-haven1-delay-2027

Pentagon-Agent: Epimetheus <3D35839A-7722-4740-B93D-51157F7D5E70>
This commit is contained in:
Teleo Agents 2026-03-28 07:02:40 +00:00
parent cd2eb3559a
commit 627d07067d
2 changed files with 48 additions and 1 deletions

View file

@ -0,0 +1,37 @@
{
"rejected_claims": [
{
"filename": "commercial-space-stations-face-technical-readiness-not-launch-cost-as-binding-constraint-post-gate-1.md",
"issues": [
"missing_attribution_extractor"
]
},
{
"filename": "vast-haven-2-modular-buildout-is-the-only-commercial-station-timeline-compatible-with-iss-transition-mandate.md",
"issues": [
"missing_attribution_extractor"
]
}
],
"validation_stats": {
"total": 2,
"kept": 0,
"fixed": 7,
"rejected": 2,
"fixes_applied": [
"commercial-space-stations-face-technical-readiness-not-launch-cost-as-binding-constraint-post-gate-1.md:set_created:2026-03-28",
"commercial-space-stations-face-technical-readiness-not-launch-cost-as-binding-constraint-post-gate-1.md:stripped_wiki_link:launch-cost-reduction-is-the-keystone-variable-that-unlocks-",
"commercial-space-stations-face-technical-readiness-not-launch-cost-as-binding-constraint-post-gate-1.md:stripped_wiki_link:commercial-space-stations-are-the-next-infrastructure-bet-as",
"vast-haven-2-modular-buildout-is-the-only-commercial-station-timeline-compatible-with-iss-transition-mandate.md:set_created:2026-03-28",
"vast-haven-2-modular-buildout-is-the-only-commercial-station-timeline-compatible-with-iss-transition-mandate.md:stripped_wiki_link:commercial-space-stations-are-the-next-infrastructure-bet-as",
"vast-haven-2-modular-buildout-is-the-only-commercial-station-timeline-compatible-with-iss-transition-mandate.md:stripped_wiki_link:the-commercial-space-station-transition-from-ISS-creates-a-g",
"vast-haven-2-modular-buildout-is-the-only-commercial-station-timeline-compatible-with-iss-transition-mandate.md:stripped_wiki_link:Axiom-Space-has-the-strongest-operational-position-for-comme"
],
"rejections": [
"commercial-space-stations-face-technical-readiness-not-launch-cost-as-binding-constraint-post-gate-1.md:missing_attribution_extractor",
"vast-haven-2-modular-buildout-is-the-only-commercial-station-timeline-compatible-with-iss-transition-mandate.md:missing_attribution_extractor"
]
},
"model": "anthropic/claude-sonnet-4.5",
"date": "2026-03-28"
}

View file

@ -7,9 +7,12 @@ date: 2026-03-01
domain: space-development domain: space-development
secondary_domains: [] secondary_domains: []
format: article format: article
status: unprocessed status: enrichment
priority: high priority: high
tags: [vast, haven-1, haven-2, commercial-stations, gate-2, technical-readiness, iss-transition] tags: [vast, haven-1, haven-2, commercial-stations, gate-2, technical-readiness, iss-transition]
processed_by: astra
processed_date: 2026-03-28
extraction_model: "anthropic/claude-sonnet-4.5"
--- ---
## Content ## Content
@ -40,3 +43,10 @@ PRIMARY CONNECTION: "Haven-1 delay reveals technical readiness as the post-Gate-
WHY ARCHIVED: Confirms delay timing (Q1 2027) and adds Haven-2 sequencing detail that makes Vast the only plausible ISS transition partner across both 2030 and 2032 deorbit scenarios. WHY ARCHIVED: Confirms delay timing (Q1 2027) and adds Haven-2 sequencing detail that makes Vast the only plausible ISS transition partner across both 2030 and 2032 deorbit scenarios.
EXTRACTION HINT: Extract both the delay claim AND the Haven-2 sequencing claim separately. They're two distinct propositions with different evidence requirements and confidence levels. EXTRACTION HINT: Extract both the delay claim AND the Haven-2 sequencing claim separately. They're two distinct propositions with different evidence requirements and confidence levels.
## Key Facts
- Haven-1 launch mass is approximately 14,000 kg, making it the heaviest Falcon 9 payload ever attempted
- Haven-1 is currently in Phase 1 integration at Vast's Long Beach headquarters as of March 2026
- Haven Demo successfully deorbited on February 4, 2026
- Vast describes the delay as 'zero-to-one development' where 'gaining more data with each milestone enables progressively more precise timelines'