extract: 2026-03-18-clps-lunar-landing-reliability-2024-2025

Pentagon-Agent: Epimetheus <968B2991-E2DF-4006-B962-F5B0A0CC8ACA>
This commit is contained in:
Teleo Agents 2026-03-18 09:38:18 +00:00
parent ec4a1c4227
commit 7e63d3deed
2 changed files with 39 additions and 1 deletions

View file

@ -0,0 +1,27 @@
{
"rejected_claims": [
{
"filename": "commercial-lunar-landing-reliability-is-the-binding-constraint-on-lunar-isru-deployment-independent-of-launch-cost-or-technology-readiness.md",
"issues": [
"missing_attribution_extractor"
]
}
],
"validation_stats": {
"total": 1,
"kept": 0,
"fixed": 4,
"rejected": 1,
"fixes_applied": [
"commercial-lunar-landing-reliability-is-the-binding-constraint-on-lunar-isru-deployment-independent-of-launch-cost-or-technology-readiness.md:set_created:2026-03-18",
"commercial-lunar-landing-reliability-is-the-binding-constraint-on-lunar-isru-deployment-independent-of-launch-cost-or-technology-readiness.md:stripped_wiki_link:launch-cost-reduction-is-the-keystone-variable-that-unlocks-",
"commercial-lunar-landing-reliability-is-the-binding-constraint-on-lunar-isru-deployment-independent-of-launch-cost-or-technology-readiness.md:stripped_wiki_link:the-30-year-space-economy-attractor-state-is-a-cislunar-indu",
"commercial-lunar-landing-reliability-is-the-binding-constraint-on-lunar-isru-deployment-independent-of-launch-cost-or-technology-readiness.md:stripped_wiki_link:water-is-the-strategic-keystone-resource-of-the-cislunar-eco"
],
"rejections": [
"commercial-lunar-landing-reliability-is-the-binding-constraint-on-lunar-isru-deployment-independent-of-launch-cost-or-technology-readiness.md:missing_attribution_extractor"
]
},
"model": "anthropic/claude-sonnet-4.5",
"date": "2026-03-18"
}

View file

@ -7,10 +7,13 @@ date: 2026-03-18
domain: space-development
secondary_domains: []
format: report
status: unprocessed
status: enrichment
priority: high
triage_tag: claim
tags: [CLPS, lunar-landing, reliability, commercial-space, moon]
processed_by: astra
processed_date: 2026-03-18
extraction_model: "anthropic/claude-sonnet-4.5"
---
## Content
@ -41,3 +44,11 @@ Comprehensive track record of NASA CLPS commercial lunar landing attempts throug
## Curator Notes
PRIMARY CONNECTION: the 30-year space economy attractor state is a cislunar industrial system with propellant networks lunar ISRU orbital manufacturing and partial life support closure
WHY ARCHIVED: Landing reliability data challenges the assumption that the ISRU pathway is gated primarily by technology readiness or launch cost — the landers themselves are the bottleneck
## Key Facts
- NASA pre-CLPS program estimate was 50% success rate (Thomas Zurbuchen)
- CLPS track record through mid-2025: 1/5 clean success (20%), 2/5 partial (tipped landers, 40%), 2/5 failed (40%)
- Blue Ghost M1 operated 14 days on surface + 5 hours into lunar night, longest commercial lunar operations
- IM-2 landed in shadowed crater at -173°C at Mons Mouton (south pole)
- ispace M2 failure was specifically Laser Range Finder hardware anomaly, not software or propulsion