extract: 2026-03-18-astrobotic-griffin1-july-2026-interlune-camera
Pentagon-Agent: Epimetheus <968B2991-E2DF-4006-B962-F5B0A0CC8ACA>
This commit is contained in:
parent
8a378b02d5
commit
94279bd0ab
1 changed files with 17 additions and 1 deletions
|
|
@ -7,12 +7,15 @@ date: 2025-10-28
|
||||||
domain: space-development
|
domain: space-development
|
||||||
secondary_domains: []
|
secondary_domains: []
|
||||||
format: news
|
format: news
|
||||||
status: unprocessed
|
status: enrichment
|
||||||
priority: high
|
priority: high
|
||||||
tags: [clps, griffin, astrobotic, interlune, lunar-landing, he3-mapping, viper-replacement, landing-reliability]
|
tags: [clps, griffin, astrobotic, interlune, lunar-landing, he3-mapping, viper-replacement, landing-reliability]
|
||||||
processed_by: astra
|
processed_by: astra
|
||||||
processed_date: 2026-03-18
|
processed_date: 2026-03-18
|
||||||
extraction_model: "anthropic/claude-sonnet-4.5"
|
extraction_model: "anthropic/claude-sonnet-4.5"
|
||||||
|
processed_by: astra
|
||||||
|
processed_date: 2026-03-19
|
||||||
|
extraction_model: "anthropic/claude-sonnet-4.5"
|
||||||
---
|
---
|
||||||
|
|
||||||
## Content
|
## Content
|
||||||
|
|
@ -73,3 +76,16 @@ EXTRACTION HINT: The double-payload concentration risk (He-3 camera + LunaGrid-L
|
||||||
- Current He-3 concentration estimates: 1.4-15 ppb in sunlit regolith, possibly 50 ppb in permanently shadowed regions (from orbital remote sensing only)
|
- Current He-3 concentration estimates: 1.4-15 ppb in sunlit regolith, possibly 50 ppb in permanently shadowed regions (from orbital remote sensing only)
|
||||||
- Astrobotic Peregrine mission failed January 2024 due to propellant leak
|
- Astrobotic Peregrine mission failed January 2024 due to propellant leak
|
||||||
- Griffin lander is first-generation hardware with no flight heritage
|
- Griffin lander is first-generation hardware with no flight heritage
|
||||||
|
|
||||||
|
|
||||||
|
## Key Facts
|
||||||
|
- Astrobotic Griffin-1 delayed from 2025 to NET July 2026
|
||||||
|
- Griffin-1 CLPS task order value: $322M
|
||||||
|
- Griffin-1 carries FLIP rover (Venturi Astrolab), Interlune multispectral camera, LunaGrid-Lite, and NASA/ESA/commercial payloads
|
||||||
|
- Griffin-1 target landing zone: lunar south pole near permanently shadowed regions
|
||||||
|
- Griffin-1 launch vehicle: SpaceX Falcon Heavy
|
||||||
|
- Griffin-1 replaces cancelled VIPER mission (cancelled July 2024)
|
||||||
|
- Current He-3 concentration estimates: 1.4-15 ppb in sunlit regolith, possibly 50 ppb in permanently shadowed regions (from orbital remote sensing only)
|
||||||
|
- Astrobotic Peregrine mission failed January 2024 due to propellant leak
|
||||||
|
- Griffin lander is first-generation hardware with no flight heritage
|
||||||
|
- Griffin-1 delay represents ~12-18 month schedule slip
|
||||||
|
|
|
||||||
Loading…
Reference in a new issue