extract: 2026-03-00-geekwire-interlune-prospect-moon-2027-equatorial

Pentagon-Agent: Epimetheus <968B2991-E2DF-4006-B962-F5B0A0CC8ACA>
This commit is contained in:
Teleo Agents 2026-03-19 13:47:05 +00:00
parent f66fb64b18
commit dce95f34e2
2 changed files with 20 additions and 6 deletions

View file

@ -1,7 +1,7 @@
{
"rejected_claims": [
{
"filename": "lunar-landing-reliability-constrains-isru-site-selection-independently-of-resource-concentration.md",
"filename": "lunar-landing-reliability-constrains-isru-site-selection-independent-of-resource-concentration.md",
"issues": [
"missing_attribution_extractor"
]
@ -13,12 +13,12 @@
"fixed": 3,
"rejected": 1,
"fixes_applied": [
"lunar-landing-reliability-constrains-isru-site-selection-independently-of-resource-concentration.md:set_created:2026-03-19",
"lunar-landing-reliability-constrains-isru-site-selection-independently-of-resource-concentration.md:stripped_wiki_link:falling-launch-costs-paradoxically-both-enable-and-threaten-",
"lunar-landing-reliability-constrains-isru-site-selection-independently-of-resource-concentration.md:stripped_wiki_link:power-is-the-binding-constraint-on-all-space-operations-beca"
"lunar-landing-reliability-constrains-isru-site-selection-independent-of-resource-concentration.md:set_created:2026-03-19",
"lunar-landing-reliability-constrains-isru-site-selection-independent-of-resource-concentration.md:stripped_wiki_link:falling-launch-costs-paradoxically-both-enable-and-threaten-",
"lunar-landing-reliability-constrains-isru-site-selection-independent-of-resource-concentration.md:stripped_wiki_link:the-self-sustaining-space-operations-threshold-requires-clos"
],
"rejections": [
"lunar-landing-reliability-constrains-isru-site-selection-independently-of-resource-concentration.md:missing_attribution_extractor"
"lunar-landing-reliability-constrains-isru-site-selection-independent-of-resource-concentration.md:missing_attribution_extractor"
]
},
"model": "anthropic/claude-sonnet-4.5",

View file

@ -7,12 +7,15 @@ date: 2026-03-00
domain: space-development
secondary_domains: []
format: article
status: unprocessed
status: enrichment
priority: high
tags: [interlune, helium-3, lunar-isru, prospect-moon, landing-reliability, mission-design]
processed_by: astra
processed_date: 2026-03-19
extraction_model: "anthropic/claude-sonnet-4.5"
processed_by: astra
processed_date: 2026-03-19
extraction_model: "anthropic/claude-sonnet-4.5"
---
## Content
@ -83,3 +86,14 @@ EXTRACTION HINT: Extract the mission design tradeoff as explicit evidence that l
- Excavator design: continuous-motion technique, 100 tonnes/hour rated capacity per Harvester
- CLPS landing success rate: 20% (1 of 5 clean successes)
- Equatorial He-3 concentration range: ~1.4-2 ppb
## Key Facts
- Interlune's Prospect Moon 2027 mission targets equatorial near-side, not south pole
- Griffin-1 mission (July 2026) carries multispectral camera to south pole for He-3 concentration mapping
- Interlune excavator current phase wraps mid-2026
- Interlune excavator design: continuous-motion technique, 100 tonnes/hour rated capacity per Harvester
- Interlune has $500M+ in total purchase orders and government contracts
- Interlune raised $5M SAFE in January 2026
- CLPS landing success rate: 20% (1 of 5 clean successes)
- Equatorial He-3 concentration range: ~1.4-2 ppb