auto-fix: strip 3 broken wiki links

Pipeline auto-fixer: removed [[ ]] brackets from links
that don't resolve to existing claims in the knowledge base.
This commit is contained in:
Teleo Agents 2026-03-20 06:21:34 +00:00
parent 0870bba037
commit e90abe6eea
3 changed files with 3 additions and 3 deletions

View file

@ -51,7 +51,7 @@ The DARPA call appears to reflect awareness of research progress (sub-30 mK achi
**KB connections:**
- Pattern 7 (He-3 demand substitution is geopolitically structured): DARPA program confirms US geopolitical dimension of He-3-free development
- [[space resource rights are emerging through national legislation]]: The US government is simultaneously enabling He-3 extraction (DOE first purchase) and trying to eliminate defense He-3 dependence (DARPA) — a genuinely contradictory position
- space resource rights are emerging through national legislation: The US government is simultaneously enabling He-3 extraction (DOE first purchase) and trying to eliminate defense He-3 dependence (DARPA) — a genuinely contradictory position
- Interlune DOE contract (3 liters by April 2029): DOE is buying He-3 even as DARPA is trying to eliminate He-3 dependence — different agencies, different time horizons
**Extraction hints:**

View file

@ -54,7 +54,7 @@ Kiutra is European (Munich), EU-funded, and NOT focused on China's strategic int
**KB connections:**
- Pattern 4 (He-3 demand temporal bound): LEMON project could produce commercial He-3-free alternatives at qubit temperatures by 2028-2030
- [[space governance gaps are widening not narrowing]]: Technology is outrunning assumptions embedded in existing He-3 contracts
- space governance gaps are widening not narrowing: Technology is outrunning assumptions embedded in existing He-3 contracts
- Interlune Bluefors contract (2028-2037): overlaps with when He-3-free alternatives might emerge commercially
**Extraction hints:**

View file

@ -52,7 +52,7 @@ All four must clear before launch. The April 9 target was always aggressive; thi
**KB connections:**
- [[Starship achieving routine operations at sub-100 dollars per kg is the single largest enabling condition for the entire space industrial economy]] — V3 is not validated until Flight 12 succeeds
- [[SpaceX vertical integration across launch broadband and manufacturing creates compounding cost advantages]] — Starship program resilience depends on maintaining cadence through anomalies
- SpaceX vertical integration across launch broadband and manufacturing creates compounding cost advantages — Starship program resilience depends on maintaining cadence through anomalies
**Extraction hints:**
- Update to: 2026-03-18-starship-flight12-v3-april-2026.md (the previously archived source)