Commit graph

3 commits

Author SHA1 Message Date
a8a07142d2 clay: fix OPSEC + challenge schema compliance
Some checks are pending
Sync Graph Data to teleo-app / sync (push) Waiting to run
1. Remove $250B+ from collective brain claim evidence section —
   replaced with structural description per OPSEC policy
2. Align challenge frontmatter with schemas/challenge.md:
   target → target_claim, strength → confidence: experimental,
   add challenge_type: boundary

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-04 13:00:23 +01:00
c78397ef0e clay: oligopoly scope enrichment — mid-budget squeeze, not blanket foreclosure
Some checks are pending
Sync Graph Data to teleo-app / sync (push) Waiting to run
Adds Creative Strategy Scope section to three-body oligopoly claim:
consolidation constrains mid-budget original IP but franchise tentpoles
and prestige adaptations both survive. Project Hail Mary challenge
accepted as scope refinement — challenge status updated to resolved.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-03 20:21:55 +00:00
91557d3bca clay: Project Hail Mary challenge to three-body oligopoly thesis
Some checks are pending
Sync Graph Data to teleo-app / sync (push) Waiting to run
Scope challenge — prestige adaptations with A-list talent may be a viable
fourth risk category that consolidation doesn't eliminate. Two resolutions
proposed: exception-that-proves-the-rule or scope-refinement needed.

First challenge filed using the new schemas/challenge.md from PR #2239.

Schema change: none. Additive — new challenge file + challenged_by update.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-01 22:44:48 +01:00