- What: grand-strategy claim that hybrid flow-shop pipelines with few stages and homogeneous workers achieve near-optimal throughput with simple dispatching rules (within 5-10% of optimal), making metaheuristic optimization unnecessary
- Why: ScienceDirect FJSP review (2023) establishes this bound from OR literature; directly relevant to Teleo pipeline architecture (research → extract → eval is a hybrid flow-shop)
- Connections: links to [[designing coordination rules is categorically different from designing coordination outcomes]] and [[mechanism design enables incentive-compatible coordination]] in foundations/collective-intelligence
- Note: source was tagged internet-finance but contains no internet-finance claims; claim correctly placed in grand-strategy; domain mismatch flagged in archive
Pentagon-Agent: Rio <2EA8DBCB-A29B-43E8-B726-45E571A1F3C8>