- Source: inbox/queue/2026-04-23-terrapower-kemmerer-groundbreaking-nrc-permit.md - Domain: energy - Claims: 0, Entities: 1 - Enrichments: 1 - Extracted by: pipeline ingest (OpenRouter anthropic/claude-sonnet-4.5) Pentagon-Agent: Leo <PIPELINE>
This commit is contained in:
parent
c7e011e0ab
commit
d205db9dd4
2 changed files with 57 additions and 1 deletions
53
entities/energy/natrium-reactor.md
Normal file
53
entities/energy/natrium-reactor.md
Normal file
|
|
@ -0,0 +1,53 @@
|
|||
# Natrium Reactor
|
||||
|
||||
## Overview
|
||||
|
||||
345 MW electric sodium-cooled fast reactor coupled to a 1 GWh molten salt energy storage system. Developed by TerraPower with DOE ARDP funding.
|
||||
|
||||
## Technical Specifications
|
||||
|
||||
- **Base output:** 345 MW electric (constant)
|
||||
- **Peak output:** 500 MW electric for 5.5 hours
|
||||
- **Storage:** 1 GWh molten salt thermal storage (borrowed from concentrated solar power industry)
|
||||
- **Reactor type:** Sodium-cooled fast reactor
|
||||
- **Load-following capability:** Reactor runs at constant power while storage system enables variable grid output
|
||||
|
||||
## Design Intent
|
||||
|
||||
- **Original purpose:** Complement intermittent renewables (solar/wind) through load-following capability
|
||||
- **Design timeline:** Pre-2020 (before AI demand wave)
|
||||
- **Retrofitted application:** AI datacenter power with training cycle variability
|
||||
|
||||
## Economics
|
||||
|
||||
- **Total cost:** ~$4B for first unit at Kemmerer
|
||||
- **Cost per GW:** ~$11.6B/GW (based on 345 MW base capacity)
|
||||
- **Funding:** DOE ARDP 50/50 cost-sharing (up to $2B DOE contribution)
|
||||
|
||||
## Commercial Deployments
|
||||
|
||||
- **Meta:** 8 units (agreement signed January 9, 2026)
|
||||
- **Google/Microsoft:** 2.5-3 GW through NextEra-TerraPower partnership (April 8, 2026)
|
||||
|
||||
## Technology Heritage
|
||||
|
||||
- **Molten salt storage:** Explicitly borrowed from concentrated solar power (CSP) industry
|
||||
- **Storage architecture:** Same technology used in solar thermal plants, adapted for nuclear heat input
|
||||
|
||||
## Timeline
|
||||
|
||||
- **2006** — TerraPower founded
|
||||
- **2020** — DOE ARDP funding selection
|
||||
- **2026-03-04** — NRC construction permit issued (first for commercial-scale advanced nuclear)
|
||||
- **2026-04-23** — Groundbreaking at Kemmerer, Wyoming
|
||||
- **2030** — Target first power
|
||||
|
||||
## Regulatory Significance
|
||||
|
||||
First commercial-scale advanced nuclear plant to receive NRC construction permit. NRC safety review completed ahead of schedule and 11% under budget, demonstrating regulatory pathway for subsequent advanced reactor projects.
|
||||
|
||||
## Related
|
||||
|
||||
- Parent company: TerraPower
|
||||
- EPC contractor: Bechtel
|
||||
- Location: Kemmerer Power Station Unit 1, Wyoming
|
||||
|
|
@ -7,9 +7,12 @@ date: 2026-04-23
|
|||
domain: energy
|
||||
secondary_domains: [manufacturing]
|
||||
format: news
|
||||
status: unprocessed
|
||||
status: processed
|
||||
processed_by: leo
|
||||
processed_date: 2026-04-24
|
||||
priority: high
|
||||
tags: [nuclear, Natrium, TerraPower, NRC, advanced-reactor, Kemmerer, Wyoming, SMR, molten-salt-storage]
|
||||
extraction_model: "anthropic/claude-sonnet-4.5"
|
||||
---
|
||||
|
||||