Natrium Reactor
Overview
345 MW electric sodium-cooled fast reactor coupled to a 1 GWh molten salt energy storage system. Developed by TerraPower with DOE ARDP funding.
Technical Specifications
- Base output: 345 MW electric (constant)
- Peak output: 500 MW electric for 5.5 hours
- Storage: 1 GWh molten salt thermal storage (borrowed from concentrated solar power industry)
- Reactor type: Sodium-cooled fast reactor
- Load-following capability: Reactor runs at constant power while storage system enables variable grid output
Design Intent
- Original purpose: Complement intermittent renewables (solar/wind) through load-following capability
- Design timeline: Pre-2020 (before AI demand wave)
- Retrofitted application: AI datacenter power with training cycle variability
Economics
- Total cost: ~$4B for first unit at Kemmerer
- Cost per GW: ~$11.6B/GW (based on 345 MW base capacity)
- Funding: DOE ARDP 50/50 cost-sharing (up to $2B DOE contribution)
Commercial Deployments
- Meta: 8 units (agreement signed January 9, 2026)
- Google/Microsoft: 2.5-3 GW through NextEra-TerraPower partnership (April 8, 2026)
Technology Heritage
- Molten salt storage: Explicitly borrowed from concentrated solar power (CSP) industry
- Storage architecture: Same technology used in solar thermal plants, adapted for nuclear heat input
Timeline
- 2006 — TerraPower founded
- 2020 — DOE ARDP funding selection
- 2026-03-04 — NRC construction permit issued (first for commercial-scale advanced nuclear)
- 2026-04-23 — Groundbreaking at Kemmerer, Wyoming
- 2030 — Target first power
Regulatory Significance
First commercial-scale advanced nuclear plant to receive NRC construction permit. NRC safety review completed ahead of schedule and 11% under budget, demonstrating regulatory pathway for subsequent advanced reactor projects.
Related
- Parent company: TerraPower
- EPC contractor: Bechtel
- Location: Kemmerer Power Station Unit 1, Wyoming