# Natrium Reactor
|
|
|
|
## Overview
|
|
|
|
345 MW electric sodium-cooled fast reactor coupled to a 1 GWh molten salt energy storage system. Developed by TerraPower with DOE ARDP funding.
|
|
|
|
## Technical Specifications
|
|
|
|
- **Base output:** 345 MW electric (constant)
|
|
- **Peak output:** 500 MW electric for 5.5 hours
|
|
- **Storage:** 1 GWh molten salt thermal storage (borrowed from concentrated solar power industry)
|
|
- **Reactor type:** Sodium-cooled fast reactor
|
|
- **Load-following capability:** Reactor runs at constant power while storage system enables variable grid output
|
|
|
|
## Design Intent
|
|
|
|
- **Original purpose:** Complement intermittent renewables (solar/wind) through load-following capability
|
|
- **Design timeline:** Pre-2020 (before AI demand wave)
|
|
- **Retrofitted application:** AI datacenter power with training cycle variability
|
|
|
|
## Economics
|
|
|
|
- **Total cost:** ~$4B for first unit at Kemmerer
|
|
- **Cost per GW:** ~$11.6B/GW (based on 345 MW base capacity)
|
|
- **Funding:** DOE ARDP 50/50 cost-sharing (up to $2B DOE contribution)
|
|
|
|
## Commercial Deployments
|
|
|
|
- **Meta:** 8 units (agreement signed January 9, 2026)
|
|
- **Google/Microsoft:** 2.5-3 GW through NextEra-TerraPower partnership (April 8, 2026)
|
|
|
|
## Technology Heritage
|
|
|
|
- **Molten salt storage:** Explicitly borrowed from concentrated solar power (CSP) industry
|
|
- **Storage architecture:** Same technology used in solar thermal plants, adapted for nuclear heat input
|
|
|
|
## Timeline
|
|
|
|
- **2006** — TerraPower founded
|
|
- **2020** — DOE ARDP funding selection
|
|
- **2026-03-04** — NRC construction permit issued (first for commercial-scale advanced nuclear)
|
|
- **2026-04-23** — Groundbreaking at Kemmerer, Wyoming
|
|
- **2030** — Target first power
|
|
|
|
## Regulatory Significance
|
|
|
|
First commercial-scale advanced nuclear plant to receive NRC construction permit. NRC safety review completed ahead of schedule and 11% under budget, demonstrating regulatory pathway for subsequent advanced reactor projects.
|
|
|
|
## Related
|
|
|
|
- Parent company: TerraPower
|
|
- EPC contractor: Bechtel
|
|
- Location: Kemmerer Power Station Unit 1, Wyoming |