reweave: connect 9 orphan claims #2673

Closed
m3taversal wants to merge 1 commit from reweave/2026-04-13 into main
Owner

Orphan Reweave

Connected 9 orphan claims to the knowledge graph via vector similarity (threshold 0.7) + Haiku edge classification.

Edges Added

  • International humanitarian law and AI alignment re → [related] → Legal scholars and AI alignment researchers indepe (score=0.839)
  • Autonomous weapons systems capable of militarily e → [supports] → Legal scholars and AI alignment researchers indepe (score=0.809)
  • FDA's MAUDE database systematically under-detects → [supports] → The clinical AI safety gap is doubly structural: F (score=0.845)
  • FDA MAUDE reports lack the structural capacity to → [supports] → The clinical AI safety gap is doubly structural: F (score=0.843)
  • Commercial station programs are LEO-only with no c → [supports] → Commercial space stations are LEO ISS-replacement (score=0.831)
  • Gateway's cancellation eliminated the orbital-infr → [related] → Commercial space stations are LEO ISS-replacement (score=0.705)
  • Commercial space stations are LEO ISS-replacement → [supports] → Commercial station programs are LEO-only with no c (score=0.831)
  • the commercial space station transition from ISS c → [supports] → Commercial station programs are LEO-only with no c (score=0.728)
  • Axiom Space has the strongest operational position → [related] → Commercial station programs are LEO-only with no c (score=0.705)
  • the commercial space station transition from ISS c → [supports] → Haven-1 slip to Q1 2027 compresses the commercial (score=0.739)
  • commercial space stations are the next infrastruct → [supports] → Haven-1 slip to Q1 2027 compresses the commercial (score=0.732)
  • Vast is building the first commercial space statio → [supports] → Haven-1 slip to Q1 2027 compresses the commercial (score=0.715)
  • gate 2 demand formation mechanisms are cost parity → [related] → Gate 2C concentrated buyer demand activates throug (score=0.798)
  • NASA's two-tier lunar architecture removes the cis → [supports] → Gateway's cancellation eliminated the orbital-infr (score=0.761)
  • Commercial space stations are LEO ISS-replacement → [related] → Gateway's cancellation eliminated the orbital-infr (score=0.705)
  • NASA's lunar south pole location choice for Projec → [supports] → ISRU-first base location reveals NASA commitment t (score=0.881)
  • in situ resource utilization is the bridge technol → [supports] → ISRU-first base location reveals NASA commitment t (score=0.732)
  • Lunar ISRU at TRL 3-4 creates a 7-12 year gap befo → [related] → ISRU-first base location reveals NASA commitment t (score=0.710)
  • ISRU-first base location reveals NASA commitment t → [related] → Lunar ISRU at TRL 3-4 creates a 7-12 year gap befo (score=0.710)
  • the Moon serves as a proving ground for Mars settl → [related] → Lunar ISRU at TRL 3-4 creates a 7-12 year gap befo (score=0.710)

Review Guide

  • Each edge has a # reweave:YYYY-MM-DD comment — strip after review
  • reweave_edges field tracks automated edges for tooling (graph_expand weights them 0.75x)
  • Upgrade relatedsupports/challenges where you have better judgment
  • Delete any edges that don't make sense

Pentagon-Agent: Epimetheus

## Orphan Reweave Connected **9** orphan claims to the knowledge graph via vector similarity (threshold 0.7) + Haiku edge classification. ### Edges Added - `International humanitarian law and AI alignment re` → [related] → `Legal scholars and AI alignment researchers indepe` (score=0.839) - `Autonomous weapons systems capable of militarily e` → [supports] → `Legal scholars and AI alignment researchers indepe` (score=0.809) - `FDA's MAUDE database systematically under-detects ` → [supports] → `The clinical AI safety gap is doubly structural: F` (score=0.845) - `FDA MAUDE reports lack the structural capacity to ` → [supports] → `The clinical AI safety gap is doubly structural: F` (score=0.843) - `Commercial station programs are LEO-only with no c` → [supports] → `Commercial space stations are LEO ISS-replacement ` (score=0.831) - `Gateway's cancellation eliminated the orbital-infr` → [related] → `Commercial space stations are LEO ISS-replacement ` (score=0.705) - `Commercial space stations are LEO ISS-replacement ` → [supports] → `Commercial station programs are LEO-only with no c` (score=0.831) - `the commercial space station transition from ISS c` → [supports] → `Commercial station programs are LEO-only with no c` (score=0.728) - `Axiom Space has the strongest operational position` → [related] → `Commercial station programs are LEO-only with no c` (score=0.705) - `the commercial space station transition from ISS c` → [supports] → `Haven-1 slip to Q1 2027 compresses the commercial ` (score=0.739) - `commercial space stations are the next infrastruct` → [supports] → `Haven-1 slip to Q1 2027 compresses the commercial ` (score=0.732) - `Vast is building the first commercial space statio` → [supports] → `Haven-1 slip to Q1 2027 compresses the commercial ` (score=0.715) - `gate 2 demand formation mechanisms are cost parity` → [related] → `Gate 2C concentrated buyer demand activates throug` (score=0.798) - `NASA's two-tier lunar architecture removes the cis` → [supports] → `Gateway's cancellation eliminated the orbital-infr` (score=0.761) - `Commercial space stations are LEO ISS-replacement ` → [related] → `Gateway's cancellation eliminated the orbital-infr` (score=0.705) - `NASA's lunar south pole location choice for Projec` → [supports] → `ISRU-first base location reveals NASA commitment t` (score=0.881) - `in situ resource utilization is the bridge technol` → [supports] → `ISRU-first base location reveals NASA commitment t` (score=0.732) - `Lunar ISRU at TRL 3-4 creates a 7-12 year gap befo` → [related] → `ISRU-first base location reveals NASA commitment t` (score=0.710) - `ISRU-first base location reveals NASA commitment t` → [related] → `Lunar ISRU at TRL 3-4 creates a 7-12 year gap befo` (score=0.710) - `the Moon serves as a proving ground for Mars settl` → [related] → `Lunar ISRU at TRL 3-4 creates a 7-12 year gap befo` (score=0.710) ### Review Guide - Each edge has a `# reweave:YYYY-MM-DD` comment — strip after review - `reweave_edges` field tracks automated edges for tooling (graph_expand weights them 0.75x) - Upgrade `related` → `supports`/`challenges` where you have better judgment - Delete any edges that don't make sense Pentagon-Agent: Epimetheus
m3taversal added 1 commit 2026-04-13 01:09:31 +00:00
reweave: connect 9 orphan claims via vector similarity
Some checks failed
Mirror PR to Forgejo / mirror (pull_request) Has been cancelled
2898dc475a
Threshold: 0.7, Haiku classification, 18 files modified.

Pentagon-Agent: Epimetheus <0144398e-4ed3-4fe2-95a3-3d72e1abf887>
Author
Owner

Thanks for the contribution! Your PR is queued for evaluation (priority: high). Expected review time: ~5 minutes.

This is an automated message from the Teleo pipeline.

Thanks for the contribution! Your PR is queued for evaluation (priority: high). Expected review time: ~5 minutes. _This is an automated message from the Teleo pipeline._
Author
Owner

Validation: PASS — 0/0 claims pass

tier0-gate v2 | 2026-04-13 01:09 UTC

<!-- TIER0-VALIDATION:2898dc475a00b9a5e963cb6adfd422d97bcd6157 --> **Validation: PASS** — 0/0 claims pass *tier0-gate v2 | 2026-04-13 01:09 UTC*
Author
Owner

Auto-approved: reweave structural update (frontmatter edges only). Leo reviews manually.

Auto-approved: reweave structural update (frontmatter edges only). Leo reviews manually.
Author
Owner

Merged locally.
Merge SHA: 215469cd28ad57e5f5a272f24089439ce844ed7a
Branch: reweave/2026-04-13

Merged locally. Merge SHA: `215469cd28ad57e5f5a272f24089439ce844ed7a` Branch: `reweave/2026-04-13`
leo closed this pull request 2026-04-13 01:10:11 +00:00
Some checks failed
Mirror PR to Forgejo / mirror (pull_request) Has been cancelled

Pull request closed

Sign in to join this conversation.
No description provided.