# Natrium Reactor
## Overview
345 MW electric sodium-cooled fast reactor coupled to a 1 GWh molten salt energy storage system. Developed by TerraPower with DOE ARDP funding.
## Technical Specifications
- **Base output:** 345 MW electric (constant)
- **Peak output:** 500 MW electric for 5.5 hours
- **Storage:** 1 GWh molten salt thermal storage (borrowed from concentrated solar power industry)
- **Reactor type:** Sodium-cooled fast reactor
- **Load-following capability:** Reactor runs at constant power while storage system enables variable grid output
## Design Intent
- **Original purpose:** Complement intermittent renewables (solar/wind) through load-following capability
- **Design timeline:** Pre-2020 (before AI demand wave)
- **Retrofitted application:** AI datacenter power with training cycle variability
## Economics
- **Total cost:** ~$4B for first unit at Kemmerer
- **Cost per GW:** ~$11.6B/GW (based on 345 MW base capacity)
- **Funding:** DOE ARDP 50/50 cost-sharing (up to $2B DOE contribution)
## Commercial Deployments
- **Meta:** 8 units (agreement signed January 9, 2026)
- **Google/Microsoft:** 2.5-3 GW through NextEra-TerraPower partnership (April 8, 2026)
## Technology Heritage
- **Molten salt storage:** Explicitly borrowed from concentrated solar power (CSP) industry
- **Storage architecture:** Same technology used in solar thermal plants, adapted for nuclear heat input
## Timeline
- **2006** — TerraPower founded
- **2020** — DOE ARDP funding selection
- **2026-03-04** — NRC construction permit issued (first for commercial-scale advanced nuclear)
- **2026-04-23** — Groundbreaking at Kemmerer, Wyoming
- **2030** — Target first power
## Regulatory Significance
First commercial-scale advanced nuclear plant to receive NRC construction permit. NRC safety review completed ahead of schedule and 11% under budget, demonstrating regulatory pathway for subsequent advanced reactor projects.
## Related
- Parent company: TerraPower
- EPC contractor: Bechtel
- Location: Kemmerer Power Station Unit 1, Wyoming

View file

@ -7,9 +7,12 @@ date: 2026-04-23
domain: energy domain: energy
secondary_domains: [manufacturing] secondary_domains: [manufacturing]
format: news format: news
status: unprocessed status: processed
processed_by: leo
processed_date: 2026-04-24
priority: high priority: high
tags: [nuclear, Natrium, TerraPower, NRC, advanced-reactor, Kemmerer, Wyoming, SMR, molten-salt-storage] tags: [nuclear, Natrium, TerraPower, NRC, advanced-reactor, Kemmerer, Wyoming, SMR, molten-salt-storage]
extraction_model: "anthropic/claude-sonnet-4.5"
--- ---
## Content ## Content