The slip of PROSPECT from 2026 to 2027 and PRIME-1 failure leaves only two critical ISRU demos in 2027 before operational systems must be designed |
experimental |
NASA Science, ESA PROSPECT mission documentation, NSSDCA records |
2026-04-13 |
PROSPECT and VIPER 2027 missions are single-point dependencies for Phase 2 operational ISRU because they are the only planned chemistry and ice characterization demonstrations before 2029-2032 deployment |
astra |
structural |
NASA Science, ESA |
|
| VIPER's late 2027 prospecting mission structurally constrains operational lunar ISRU to post-2029 because extraction system design requires site characterization data |
|
| VIPER's late 2027 prospecting mission structurally constrains operational lunar ISRU to post-2029 because extraction system design requires site characterization data|supports|2026-04-17 |
| Chang'e-7|related|2026-04-24 |
| NASA LIFT-1 ISRU extraction demonstration program remaining at pre-contract RFI stage 2.5 years after solicitation suggests institutional friction as much as technical uncertainty|related|2026-04-29 |
|