Some checks are pending
CI / lint-and-test (push) Waiting to run
- Record clone-proven Helmer 7 Powers packet evidence for team handoff. - Update Working Leo state and execution plan with the current non-production claim ceiling. - Add live rollback and clone rollback logs so reviewers can inspect the row-level proof. `docs/reports/leo-working-state-20260709/current-truth-index.md` `docs/reports/leo-working-state-20260709/helmer-7powers-clone-commit-delete-rollback-current.log` `docs/reports/leo-working-state-20260709/helmer-7powers-live-preflight-rollback-current.log` `docs/reports/leo-working-state-20260709/helmer-7powers-production-apply-packet-current.md` `docs/reports/leo-working-state-20260709/leo-db-state-14-helmer-packet.svg` `docs/reports/leo-working-state-20260709/working-leo-current-state-20260709.md` `docs/reports/leo-working-state-20260709/working-leo-execution-plan-current.md`
2.4 KiB
2.4 KiB
Helmer 7 Powers Production Apply Packet - 2026-07-09
Status: packet ready and clone-proven; not executed on production.
Proposal:
a64df080-8502-42e2-98f4-9bbdecb8da73- Status on production preflight:
approved - Proposal type:
attach_evidence - Reviewer:
m3taversal - Reviewed at:
2026-06-29 16:32:39.431004+00
Generated row contract:
public.reasoning_tools: 1 rowpublic.claims: 5 rowspublic.sources: 13 rowspublic.claim_edges: 7 rowspublic.claim_evidence: 17 rows
Important boundary:
- The canonical reasoning-tool row is sanitized: Teleo-specific self-positioning/application examples are removed from the reasoning-tool description and counted as deferred.
- The packet does not mark the original
kb_stage.kb_proposalsrow asapplied. - Production commit SQL exists only for separately authorized execution. It has not been run against production.
Live production rehearsal:
- Preflight found the proposal approved and all required existing target claims present.
- Preflight generated-row counts were
0/0/0/0/0for reasoning tool / claims / sources / edges / evidence. - Rollback-only apply rehearsal inserted the planned rows inside a transaction and ended with
ROLLBACK. - Post-rehearsal production generated-row counts remained
0/0/0/0/0.
Disposable clone proof:
- Disposable DB:
teleo_helmer_rehearsal_20260709 - Clone commit produced
1reasoning tool,5claims,13sources,7claim edges, and17claim evidence rows. - Clone postflight read back reasoning tool
473ba7b0-ce44-5e77-bc46-ef82a49b6a3enamedHelmer 7 Powers. - Delete rollback removed
17evidence rows,7edge rows,13source rows,5claim rows, and1reasoning-tool row. - Clone after delete returned generated-row counts to
0/0/0/0/0. - Production after clone remained
0/0/0/0/0. - Disposable clone was dropped; final clone DB count was
0.
Packet files:
production-preflight.sqlproduction-apply-rollback-rehearsal.sqlproduction-apply-authorized-commit.sqlproduction-postflight.sqlproduction-delete-rollback.sqlproduction-apply-packet.jsonproduction-apply-packet-summary.jsonlive-preflight-rollback-current.logclone-commit-delete-rollback-current.log
Claim ceiling: This proves the approved Helmer 7 Powers framework can be represented and rolled back safely using current canonical tables. It does not prove production has been updated, because production commit was intentionally not executed.